A quarter done

There is a practical way for cutting across Boeng Tumpoan to Ta Khmao now with at least 1/4 of the Hun Sen highway unofficially finished.

View from Boeng Trabek pumping station

Construction entrance off of 271

Construction road entrance (already being used)

North end of the road

Construction connection to the ‘highway’

North end of the highway (H.S. Radar tower in the background)

Unfortunate houses (blocking the way for connection to 271)

Looking south down the Hun Sen Blvd.

Looking south down the Hun Sen Blvd.

Plots of land already being developed on the side of the new highway

Looking south down the Hun Sen Blvd.

ISPP’s new school being built beside the highway

Connection road to highway 2 between PP and Ta Khmao

ISPP’s new school under construction beside the road

A new factory going up on reclaimed land beside the road

South end of the road so far (more lake infilling required now)

South end of the road

Looking north along the Hun Sen Blvd.

Front entrance to that factory mentioned earlier

Typical construction plot on infilled portion of Boeng Tumpoan

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: